19 February 2008 — Second Bedroom Painted

I haven't been posting much lately, but that doesn't mean nothing has been happening. I've spent the last few weeks prepping the walls and ceiling in the second bedroom and now we have some color.

Next up for this room is refinishing the floors, painting the trim and doors, installing new baseboard trim and casing around the doors, and finding some new window coverings.

We'll also have to decide what to do about the line between the wall and ceiling colors. Note the rounded ceiling on two sides of the room. That makes it difficult to just paint up to the ceiling. We are thinking either a stencil pattern of some sort or a picture rail. The picture rail might end up being easier to do, and easier may come out the winner at this point.